Tuesday, 11 March 2014

Fitting around the door and a lamp in the ceiling!




The first bit of plumbing !






The house have not been habited for over 50 years and there were no plumbing at all. It all has to be built in and Paul has started by getting water in and waste out from the loft washroom.

An old door being reused...

The door was in the house when I bought it. It need a bit of TLC but is perfectly usable.
I have to remember to ask Paul if it was threated for woodworm.

Loft washroom walls


Plaster board on both sides

Insulation 



Boards on the outside