Tuesday, 28 February 2017

Water boiler

Work has started in my house again after a long break. The plan is to finish the loft completely. In short this means properly wired electrics, plaster boards on the dividing walls, moving the walls to fit in a shower in the bathroom and a few other bits and bobs.


The water boiler has arrived but it was difficult to get it up on the loft so it will be on the second floor. It will warm water for both the loft shower and the second floor bathroom.