Walls plastered for a smooth surface
Friday, 31 March 2017
Friday, 24 March 2017
Friday, 17 March 2017
Saturday, 11 March 2017
Loft washroom
The loft washroom really only had a toilet and a sink. We had to dismantle everything and move the walls to fit a shower in. The base for the shower is now in place and the sink has been reinstalled in it's new place.
Saturday, 4 March 2017
Wednesday, 1 March 2017
Wrapping it up
Graham the van man is coming on Saturday to pick up some essentials that I am sending to Auzon. The load includes books, a table and a guest bed and my bicycle. I spent some time wrapping it all up and hope it will not be damaged on the journey.
Subscribe to:
Posts (Atom)