Saturday, 14 March 2020

Sunday, 1 March 2020

Water pipes, electric wires and insulation

Lots of things going on at the moment

 Water pipes and electric cables being fitted 

Insulation and electric wires fitted on the kitchen wall

Insulation for the main walls

Plasterboard for the walls



Friday, 21 February 2020

Decisions decisions


Where to place important items....
pipes must be in the right place so we have to decide.

Friday, 14 February 2020

More framework and a bedroom door

View from the bedroom 


Door to bedroom 

The wall between bath and bedroom 


A closer look at the view



Bathroom with a view 

Friday, 24 January 2020

Kitchen floor


The old floor was uneven so it was removed. Cement was used to add hight. 


New board was but in. It will eventually be covered with pinewood planks.

Wednesday, 15 January 2020

Back after a break

After a long break, we have started renovating the second floor. Kitchen floor will be replaced as the first task. Photos will come soon.