My House in Auzon
Saturday, 14 March 2020
Bedroom plasterboard and kitchen floor
The kitchen floor is coming along
Bedroom walls
Friday, 6 March 2020
Plasterboard on kitchen walls
Plasterboard on my bedroom walls
Sunday, 1 March 2020
Water pipes, electric wires and insulation
Lots of things going on at the moment
Water pipes and electric cables being fitted
Insulation and electric wires fitted on the kitchen wall
Insulation for the main walls
Plasterboard for the walls
Friday, 21 February 2020
Decisions decisions
Where to place important items....
pipes must be in the right place so we have to decide.
Friday, 14 February 2020
More framework and a bedroom door
View from the bedroom
Door to bedroom
The wall between bath and bedroom
A closer look at the view
Bathroom with a view
Saturday, 8 February 2020
Bedroom and bathroom walls coming up
Sunday, 2 February 2020
Kitchen walls coming up
All straight lines when metal is used.
Friday, 24 January 2020
Kitchen floor
The old floor was uneven so it was removed. Cement was used to add hight.
New board was but in. It will eventually be covered with pinewood planks.
Wednesday, 15 January 2020
Back after a break
After a long break, we have started renovating the second floor. Kitchen floor will be replaced as the first task. Photos will come soon.