Tuesday, 14 December 2021

Last work of the year - kitchen floor and top of the stairs area.


Kitchen floor varnished and walls painted. 


Plaster-boarding top of the stairs area - this is coming along well.

Saturday, 16 October 2021

Getting there with the bathroom....

Its been difficult and time-consuming to connect the UK made sink and toilet to the French sizes pipes that are all a bit different.


Sunday, 12 September 2021

Work in the bathroom!


Getting the floor ready for tiling with a special levelling compound with extra
 fibres to strengthen it and make it water resistant.


 Feet for the bathtub 



Placing the bathtub

Sunday, 1 August 2021

Monday, 26 July 2021

This week - let there be light!

 New Electric consumer unit installed and the lighting connected and tested.

Bathroom


Walk in closet  

Kitchen 

Top of stairs 



Friday, 9 July 2021

A lamp for the kitchen!

I found this lamp in a charity shop, perfect for the kitchen... 


 

Saturday, 3 July 2021

This week - work continues in the bathroom!

 



Sink,BD and toilet are not yet fixed as the floor has to be fitted first.  
Sink drain is in, just needs connecting when floor is done


Saturday, 5 June 2021

More plumbing installed in the kitchen

 

This is where the sink and the washing machine will go 

Cables hidden in the wall