Thursday, 20 June 2024

The chandelier is in place!


A big problem occurred!

We had extreme rain over a long period this winter and spring and it has caused a problem. We have discovered dry rot in a part of first and second floor walls.

The damage was discovered early and it is in a limited area but it still means we had to remove plasterboard and some wood. It is in the bathroom and a part of the wall in the living room.

The infected area will have standard treatment for dry rot which is time consuming and costly but it has to be done.

We will try to continue as much work as possible in the rest of the house while we wait for the expert to come and threat the infected walls.